Licensed · Bonded · Insured — Free On-Site Estimates Mon – Sat: 7:00 AM – 6:00 PM · (555) 555-0148

Flatwork Done Right

Concrete Driveways, Patios & Walkways In Your City

Tear-Out To Final Seal — One Crew, One Written Quote

Placeholder paragraph about your flatwork process: honest measurement, proper base prep, steel reinforcement, the right thickness for the load, and joints cut before the slab decides where to crack on its own.

A second placeholder paragraph about scheduling, weather windows and how you protect landscaping and leave the site clean.

Schedule A Site Visit
Home with a wide concrete driveway and garage

Concrete Driveways

Typical Install: 2 – 4 Days

Placeholder description — full replacement or new construction, sized and reinforced for daily traffic, trailers and the occasional moving truck.

Starting At (Placeholder Pricing)

Broom Finish$9 / sq ft
Exposed Agg.$13 / sq ft
Stamped$16 / sq ft

Every Driveway Includes

  • Tear-out & haul-away of the old slab
  • Compacted gravel base and grading
  • Rebar or wire mesh reinforcement
  • 4" – 6" pour matched to the load
  • Control joints cut on schedule
  • Sealing and clean curb transitions
White home with a concrete pool deck

Patios & Pool Decks

Typical Install: 2 – 5 Days

Placeholder description — outdoor living slabs with the right slope, slip-resistant finishes and layouts that fit your furniture, grill and fire pit plans.

Popular Options

  • Broom or swirl finishes for grip
  • Stamped & colored upgrades
  • Exposed aggregate borders
  • Cool-touch sealers for pool decks
  • Steps & seating walls — placeholder
  • Drainage planning away from the house
Concrete steps and walkway at a modern home entry

Walkways & Steps

Typical Install: 1 – 3 Days

Placeholder description — safe, level paths and entry steps that handle freeze-thaw cycles and boost curb appeal from the street.

Every Walkway Includes

  • Grading & forming for straight lines
  • Reinforced pours — placeholder detail
  • Non-slip finishes for wet weather
  • Code-height steps and landings
  • Edging & joint detail — placeholder
  • Sealing for stain resistance

Common Concrete Questions

How long before we can walk or drive on new concrete?

Placeholder answer — typically foot traffic in 24–48 hours and vehicles after about 7 days, with full cure strength near 28 days. Your business would give its exact guidance here.

Will my new slab crack?

Placeholder answer — concrete moves, which is why control joints are cut in the right places at the right time so any hairline cracking happens where it was planned to.

Can you pour in cold or rainy weather?

Placeholder answer — describe your seasonal scheduling policy, blankets and additives for shoulder-season pours, and when a pour gets rescheduled.

Do you remove and haul away the old concrete?

Placeholder answer — yes, tear-out, haul-away and recycling of the old slab would be included in the written quote, along with site cleanup.

Long concrete walkway beside a manicured lawn Minimalist white home with concrete drive Classic home with wraparound porch and front walk Home at sunrise along a quiet concrete drive

Get A Flat, Written Quote For Your Driveway Or Patio This Week

Get A Free Estimate
© 2026 Bedrock Concrete Co. — a sample business. Demo site designed by Sitely.
Demo by Sitely — want a site like this?